NYC Bathroom Renovation

Full gut renovations built to last. From Schluter waterproofing systems to DOB-permitted plumbing, we execute to the highest architectural standards.

Detailed Scope of Work

A premium renovation leaves nothing to chance. Every contract includes a line-by-line breakdown of specifications.

Item Specification / Standard
Demolition Take down to studs/joists. Dust protection and debris carting included.
Plumbing New rough-in for tub/shower, toilet, vanity. All NYC DOB permitted work.
Waterproofing Full Schluter KERDI or RedGard liquid membrane system. No cutting corners on moisture barriers.
Tile Installation Floor tile meets DCOF ≥ 0.42 slip-resistance. Precision layout and premium unsanded/sanded grout.
Electrical GFCI outlets, dedicated exhaust fan circuit, recessed LED lighting in EMT conduit.
Drywall & Paint Mold-resistant purple board. Level 4 skim coat. Benjamin Moore Aura Bath & Spa finish.
Vanity & Fixtures Installation of client-selected vanity, faucets, and shower trim kits to manufacturer specs.
Accessories Secure mounting of mirrors, medicine cabinets, and towel bars into blocking.
Closeout Deep clean, formal punch list walk-through, and delivery of 2-year warranty documents.

Typical Cost Range

$14K – $90K
NYC Metro · Mid-Range Finish

Typical Timeline

3 – 6 Weeks
Dependent on DOB approvals & building rules.

Lintel NY Includes

  • Written contract & SOW
  • All DOB / Town permits
  • 2-year labor warranty
  • Formal punch list sign-off
  • Daily progress updates

Execution Phases

1

Demo & Rough-In

We strip the space, address hidden conditions, and run all new rough plumbing and electrical lines.

2

Waterproofing

Application of the Schluter system or liquid membrane to ensure a 100% watertight enclosure.

3

Tile Installation

Precision setting of wall and floor tiles, maintaining perfect grout lines and drain sloping.

4

Fixtures & Vanity

Installing the cabinetry, lighting, toilets, and trim kits. Painting the drywall.

5

Final Sign-Off

A detailed walkthrough to ensure everything meets the agreed-upon written scope.

Service FAQs

In almost all cases in NYC, yes. If you are moving plumbing fixtures or updating the electrical wiring behind the walls, the Department of Buildings requires a permit. We file everything for you to keep the project completely legal and safe from stop-work orders.
For a standard gut renovation, the physical work takes between 3 to 6 weeks. However, co-op board approvals and DOB permit lead times can add several weeks before a hammer is swung. We outline the exact timeline in your written proposal.
Our estimates include clear allowances for finish materials (tile, vanity, fixtures) based on the finish level you choose in our calculator. If you select materials under the allowance, you save money. If you choose higher-end luxury materials, the difference is cleanly mapped out via a signed change order.

Ready for a Better Bathroom?

Schedule a site visit and receive a fully transparent, written proposal.