Historic preservation meets modern architectural standards. From parlor floor transformations to structural overhauls and facade restorations.
Century-old homes require specialized knowledge. Our comprehensive brownstone scope addresses both visible finishes and invisible structural integrity.
| Item | Specification / Standard |
|---|---|
| Structural Assessment | Review of existing joists, load-bearing walls, and masonry. Sourcing engineer stamped drawings. |
| Remediation | EPA-certified safe removal and disposal of lead paint or asbestos. |
| Plumbing Upgrade | Complete replacement of deteriorating galvanized pipes to modern copper/PEX systems. |
| Electrical Upgrade | Removal of outdated knob-and-tube. Upgrading main panels (200A+) and full EMT conduit rewiring. |
| Interior Renovation | Full kitchen, bathroom, and living space build-outs. Leveling sagging historic floors. |
| Historic Detail | Restoration or faithful reproduction of plaster moldings, original woodwork, and mantels. |
| Facade & Exterior | Brownstone scratch/brown coat patching, repointing, and cornice restoration. |
| Permits & Approvals | Filing ALT-1 or ALT-2. Handling Landmarks Preservation Commission (LPC) approvals if required. |
Filing permits and securing Landmarks Preservation Commission approvals for historic districts.
Safe lead/asbestos abatement and structural exposure for engineer review.
Complete overhaul of aging plumbing lines, joist reinforcement, and electrical panels.
Building out the modern kitchens/baths while restoring plasterwork and historic woodwork.
Closing all DOB permits, final walkthroughs, and warranty initiation.
"Our Park Slope brownstone had sagging joists and ancient knob-and-tube wiring. Lintel NY managed the structural engineer, the DOB, and the stunning parlor floor restoration effortlessly."
"Getting anything past the Landmarks Commission seemed impossible until Lintel stepped in. Their knowledge of historic brickwork and cornice reproduction saved our timeline."
"The transparency was what won us over. Written contracts, precise change orders, and no hidden fees even when we discovered unexpected asbestos."