High-end execution for the heart of your home. We handle complex electrical loads, precise millwork integration, and seamless countertop coordination.
Note: To adhere to strict timelines, all client material selections must be finalized within 5 business days of signing the contract.
| Item | Specification / Standard |
|---|---|
| Demolition | Full tear-out of cabinets, appliances, counters, and flooring. Carting included. |
| Plumbing | Relocation or new rough-in for sink, dishwasher, and ice maker lines. NYC DOB permitted. |
| Electrical | Dedicated 20A circuits for appliances, GFCI per NEC 210.52(A), under-cabinet LEDs in EMT conduit. |
| Cabinets | Installation of semi-custom/custom cabinetry. Laser-leveled with soft-close hardware. |
| Countertops | Coordination of quartz/stone template and install (standard 10–14 day fabrication lead time). |
| Backsplash | Wall prep, waterproofing where necessary, tile setting, and grouting. |
| Flooring | Subfloor leveling. Installation of LVP, engineered wood, or tile. |
| Drywall & Paint | Level 4 finish on all exposed walls and ceilings. Premium kitchen-grade paint. |
| Appliance Reconnect | Final connection and testing of ranges, hoods, fridges, and dishwashers. |