HomeServicesBrownstone Renovation

Lintel NY

Brownstone Renovation

Detail-heavy brownstone renovation where hidden conditions and sequencing matter. We start with structural assessment and environmental testing before committing you to a budget, not after.

Scope of Work

ItemSpecification
Structural AssessmentEngineer evaluation of floor joists, bearing walls, foundation, facade. Report before scope finalization
Lead & AsbestosEPA RRP certified remediation. Testing, containment, removal, clearance documentation
Plumbing UpgradeGalvanized to copper throughout. New risers, branch lines. DOB permitted
Electrical UpgradeKnob-and-tube removal. New 200A panel. Full rewire with EMT conduit. Con Edison coordination
Kitchen & BathroomsComplete renovations per separate service scopes
FlooringHardwood refinishing, subfloor repair, or new installation
FacadeRepointing, lintel repair, cornice work. LPC filing if landmark district
PermitsALT-1 or ALT-2. LPC application for landmark districts. Expediter coordination
Planning Range
$65,000 – $650,000
NYC Metro · Mid-Range Finish
Typical Timeline
8–40 weeks
Lintel NY Includes
Written contract & scope of work
All DOB / Town permits filed
2-year labor warranty
Formal punch list sign-off
Daily progress updates

Project Phases

How it happens.

01
Assessment
Structural engineer inspection. Environmental testing. Full condition report. This phase determines your real budget.
02
Remediation
Lead and asbestos removed by certified crews. Clearance testing before renovation begins.
03
Structural & Systems
Any structural repairs first. Then plumbing risers, electrical service upgrade, HVAC.
04
Renovation
Kitchen, bathrooms, flooring, drywall, paint. Finish work starts once systems are inspected.
05
Facade & Close-Out
Exterior work if in scope. DOB final inspections. LPC sign-off if applicable.

FAQ

Common questions.

If your brownstone is in a landmark district, exterior changes require LPC approval. Interior work is not affected. We file LPC applications as part of scope.
Deteriorated floor joists, galvanized plumbing, knob-and-tube wiring, lead paint, foundation settlement. Our structural assessment catches these before you commit to a budget.
For single-floor renovations, yes — we phase the work. For full-house structural work, temporary relocation is usually necessary for safety.

Related Services

Ready to turn a rough idea into a scoped conversation?

Use the calculator for an early range or go straight to the estimate form.